Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.1127623
- Product Categories
- Friendly Links
- home > Supply > Urgent for: 35 tons of clean combustion turbine generator circulating fluidized bed boiler
Information Name: | Urgent for: 35 tons of clean combustion turbine generator circulating fluidized bed boiler |
Published: | 2006-03-19 |
Validity: | 20 |
Specifications: | YG35-3.82/450/M2 |
Quantity: | 1.00 |
Price Description: | About 75 million |
Detailed Product Description: | Urgent for: 35 tons of clean combustion turbine generator circulating fluidized bed boiler in operation for 94 Capacity needs now 95 years of manufacturing investment in the second half of Jinan Boiler Works with 35 tons of circulating fluidized bed boiler power generation boiler set of three sets of 75 single million, 2.18 million one-time about three (only the same or lower than the purchase of a new furnace charge) emergency transfer. Directly to the user on March 25 with payment or deposit to contact for Jinan, Shandong; (b) 2002, Nanjing Boiler Works in 2001 to install manufacturing SHL15-2.45/400A2 type (large furnace to enhance design 15 tons) boilers (including the upgrading of coal machine, blower, induced draft fan, water treatment, feed pump, steam boiler Flue pipes, valves and meters, electronic control equipment, steel structure plant, 1,000 kW back-pressure generating device unit package; (c) single-level position in Taiwan Shanghai layout quick steam producing 3000 kilowatts (pumping two kilograms) with a 6300 volt electrical control turbine power generation, power distribution equipment and all around 600 square meters large removable steel boiler steam room (not reinforced concrete, construction cycles are significantly shortened, less money, about two months to construction of production) line of all-steel hanging platform so radical transfer; (d) 24 kg 750 kW, 1000 kW, 1500 kilowatts of back pressure, condensate and 35 kg 3000 1500 pumping back pressure, 6000 condensation turbine selection matching with it; (e) 2001 35 t Chain Hang entire pot boiler, 04 20 t 16 kg of Nantong Boiler bulk three sets of large industrial boiler room high-configure the entire device; (f ) 2004 15 tons of new two-assembly could be generating 25 kg of 400 degrees extraction condensing boiler with a 900 (simply change the heating or power generation, while in the steam generation for production of high and low temperature heat source, replace the motor or turbine directly drive to reduce electricity costs of large rotating equipment to achieve comprehensive utilization of energy-saving energy and improving economic benefit). 13,705,417,900 Liu |
Admin>>>
You are the 6318 visitor
Copyright © GuangDong ICP No. 10089450, Boiler supply swap All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6318 visitor
Copyright © GuangDong ICP No. 10089450, Boiler supply swap All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility